Before the partition, Lahore was the center of attraction, and it has continued to attract visitors from all over the world since becoming a part of Pakistan. Lahore, the city of gardens, has a lot of history and culture and is in the middle of Punjab. There is always something unique, interesting, and useful for both people who live there and people who come to visit. Lahore has an excellent road network, an IT industry, and numerous roadways, including the metro bus service, Speedo Red Bus Service, and now Pakistan’s first Rail Transit Orange Line.
History
The Lahore Rail Transit Orange Line is Pakistan’s first metro train. The whole point has been that NORINCO International Cooperation Ltd. has shown itself to be a global stakeholder in international operations, investment, global resources, location, financing, and project management. adapted from Chinese standards, technology, and equipment. The Orange Train Lahore is part of the “Belt and Road” for the China-Pakistan Economic Corridor.
The Northern Industrial Association and China Railway Corporation signed an EPC contract in April 2015 for the maintenance of mechanical and electrical EPC. The project was subsequently signed on February 25, 2020.
Partners
Norinco International, Guangzhou Metro, and Daewoo Express are all working together on the Orange Train in Lahore.
Norinco International
NORINCO International Cooperation Ltd. is an incorporated firm affiliated with China North Industries Corporation.
Guangzhou Metro:
Guangzhou Metro Group Co. Ltd. was established in 1992. The Guangzhou Metro Group Co., Ltd. has been planning, designing, building, and managing for 27 years. In that time, it has become totally self-sufficient and developed its own model for how to develop in a way that is sustainable.
Daewoo Express:
One of the biggest and most interesting foreign investment companies in Pakistan is Daewoo Express. Its transportation system is modern and well-run. Also, it is the only transportation service in the country that works all over the country and has trade links with other countries. They have a diverse fleet of buses with skilled and professional drivers.
What are the Orange Train Lahore Timings/Working Hours?
The Orange Train Lahore is proud to be open seven days a week, from Monday to Sunday, from 06:00 AM to 11:00 PM GMT +5.
What is the fare of the Orange Train in Lahore?
The Punjab Mass Transit Authority (PMA) says that each passenger on the Orange Train in Lahore is charged Rs 40.
Orange Train Lahore Route Map:
The Orange Line train route through Lahore connects the south and north poles of the city. The train starts its journey from Ali Town, near Thokar Niaz Baig, and ends at Dera Guggaran. It has 26 stations, of which 24 are above ground and 2 are underground. These are the following stations covered by the Orange Train in Lahore:
- Ali Town
- Thokar Niaz Baig
- Canal View
- Hanjarwal
- Wahdat Road
- Awan Town
- Sabzazar
- Khatam-e-Nabuwat
- Salahuddin Road
- Bund Road
- Samanabad
- Gulshan-e-Ravi
- Chauburji
- Lake Road
- GPO
- Lakshmi
- Railway Station
- Sultanpura
- UET
- Baghbanpura
- Shalamar Garden
- Pakistan Mint
- Mahmood Booti
- Islam Park
- Salamatpura
- Dera Gujran
Specifications for the Orange Line Metro Train in Lahore:
On October 25, 2020, the Orange Line Metro Train in Lahore was completed and inaugurated. The estimated cost of the project is 1626 million US dollars. Its main depot is at Dera Gujran, where it has its main operation control center, overhauling facilities and workshops, training center, and parking facility. But its stable is in Ali Town, where there are places to park and wash the horse and do small repairs.
Some of the vital specifications of the Orange Line Metro Train are as follows:
- Length = 27.12 KM
- Cut and Cover Section = 1.72 KM
- Elevated Section = 25.4 KM)
- Stations = 26
- Elevated Stations = 24
- Underground Stations = 2
- Rolling Stock = 27 Train sets
Reference Link: https://web.olmrts.com.pk/